海阳VSIP工业园区

Quick Facts

IP developer

VSIP Hai Duong

Total IP land area

150 ha

BW's land area

42.6 ha

Location

Plot 5, Cam Dien - Luong dien Industrial Park, Cam Dien Commune, Cam Giang District, Hai Duong Province, Vietnam

Property type

Ready-built factory

Construction timeline

May - October 2019 (Phase 1)

Land expiry

05 August, 2058

Embark on a succesful journey with BW

  • Strategic location with convenient access to both Hanoi and Hai Phong, direct access to Hanoi - Hai Phong Highway
  • Competitive employment costs (region 3 minimum wage)
  • Hassle-free bussiness setup thanks to BW's strong connections with the local authorities
  • Presence of mature neighboring industries:

Tax incentives

Normal tax rate = 20%
(for common industries)

Preferential industry tax rate = 10%
(for the first 15 years)*
*Applicable to preferential industries:
• High-tech industries
• Total investment capital: 6,000 billion VND (~265 million USD)
+ Capital contribution within 3 years
+ At least 3,000 employees

Utilities

Stable Power Supply: 96 - 333 KVA/factory
New price from 20 March, 2019. Exchange rate USD/VND = 23,210 (selling rate of Vietcombank on 25 April, 2019)

• Water usage rate: standard (14,500 VND/m3)
• Wastewater treatment: 5,849 VND/m3 (based on 80% water consumption)
• Telecommunication by VNPT
• Internet cable and phone lines: connection points are installed up to each individual factory unit

* All prices are VAT exclusive

  High tension 22 KV
(Capacity ≥ 250 KVA)
Low tension 380 V
(Capacity < 250 KVA)

Normal hours
Monday to Saturday:
+ 04:00 - 09:30
(05 hours and 30 minutes)
+ 11:30 - 17:00
(05 hours and 30 minutes)
+ 20:00 - 22:00 (02 hours)
Sunday: 04:00 - 22:00 (18 hours)

1,555 VND/kWh 1,685 VND/kWh

Peak hours
Monday to Saturday:
+ 09:30 - 11:30 (02 hours)
+ 17:00 - 20:00 (03 hours)

2,871 VND/kWh 3,076 VND/kWh

Off-peak hours
All days from 22:00 to 04:00 the next morning (06 hours)

1,007 VND/kWh 1,100 VND/kWh

Proximity

  To Hanoi Center To Hai Phong Port To Noi Bai Airport
52 Km 61 Km 62 Km
75 minutes 90 minutes 90 minutes

Transportation cost *Updated price from March 2019

To 40 ft FCL (VND/trip) 2 ton Truck (VND/trip)
Noi Bai Airport   750,000
Hai Phong Seaport 4,250,000  
*This cost includes trucking and toll fee only, excludes lift on/off and other charges

Minimum wage 3,250,000 VND/ month (region 3) *According to Decree No. 157/2018/ND-CP on 01 January, 2019

Facilities

Car & motorcycle sidewalk parking

24hr security with CCTV, fence and security booth

Fire fighting system (emergency switch, fire alarm, fire hose box, fire extinguisher)

 

Download Hai Duong Masterplan HERE

项目的特点

图片

地址

越南海阳省锦江郡锦田市锦田 - 梁田工业园第5批

联系人

(+84) 28 710 29 000

[email protected]