北宁VSIP工业园区

Quick Facts

IP developer

VSIP Bac Ninh

Total IP land area

500 ha

BW's land area

3.8 ha

Location

No. 05, Road 21A, VSIP Bac Ninh Integrated Township and Industrial Park, Dai Dong Commune, Tien Du District, Bac Ninh Province, Vietnam

Property type

Ready-built factory

Construction timeline

February - July 2019 (Phase 1)

Land expiry

30 November, 2057

Embark on a succesful journey with BW

  • Strategic located next to Highway 1 and 3, connecting to all Northern Provinces, with close proximity to Noi Bai Airport for easy access to main infrastructure and amenities of Hanoi
  • Hassle-free bussiness setup thanks to BW's strong connections with the local authorities
  • Presence of mature neighboring industries:

Tax incentives

Normal tax rate = 20%
(for common industries)

Preferential industry tax rate = 10%
(for the first 15 years)*
*Applicable to preferential industries:
• High-tech industries
• Total investment capital: 6,000 billion VND (~265 million USD)
+ Capital contribution within 3 years
+ At least 3,000 employees

Utilities

Stable Power Supply: 250-400 KVA/factory
New price from 20 March, 2019. Exchange rate USD/VND = 23,210 (selling rate of Vietcombank on 25 April, 2019)

• Water usage rate: standard (9,470 VND/m3)
• Wastewater treatment: 4,910 VND/m3 (based on 80% water consumption)
• Telecommunication by VNPT
• Internet cable and phone lines: connection points are installed up to each individual factory unit

* All prices are VAT exclusive

  High tension 22 KV
(Capacity ≥ 250 KVA)
Low tension 380 V
(Capacity < 250 KVA)

Normal hours
Monday to Saturday:
+ 04:00 - 09:30
(05 hours and 30 minutes)
+ 11:30 - 17:00
(05 hours and 30 minutes)
+ 20:00 - 22:00 (02 hours)
Sunday: 04:00 - 22:00 (18 hours)

1,555 VND/kWh 1,685 VND/kWh

Peak hours
Monday to Saturday:
+ 09:30 - 11:30 (02 hours)
+ 17:00 - 20:00 (03 hours)

2,871 VND/kWh 3,076 VND/kWh

Off-peak hours
All days from 22:00 to 04:00 the next morning (06 hours)

1,007 VND/kWh 1,100 VND/kWh

Proximity

  To Hanoi CBD To Noi Bai Airport To China Border
22 Km 43 Km 152 Km
37 minutes 43 minutes 170 minutes

Transportation cost *Updated price from March 2019

To 40 ft FCL (VND/trip) 2 ton Truck (VND/trip)
Noi Bai Airport   750,000
Hai Phong Seaport 4,250,000 1,650,000
*This cost includes trucking and toll fee only, excludes lift on/off and other charges

Minimum wage 3,710,000 VND/ month (region 2) *According to Decree No. 157/2018/ND-CP on 01 January, 2019

Facilities

Car & motorcycle sidewalk parking

24hr security with CCTV, fence and security booth

Fire fighting system (emergency switch, fire alarm, fire hose box, fire extinguisher)

 

Download Bac Ninh Masterplan HERE

项目的特点

图片

地址

联系人

(+84) 28 710 29 000

[email protected]