INDUSTRIAL FACTORY FOR RENT IN VSIP HAI DUONG IP HAI DUONG
BW’s industrial factory rent with high quality inside industrial Zone in VSIP Hai Duong IP Hai Duong. Prime location with easy access to both Hanoi and Hai Phong, direct access to Hanoi - Hai Phong Highway. The total land area is around 150 ha. Car & motorcycle sidewalk parking is available for workers. Power Supply: 96 - 333 KVA/factory and sprinkler system is installed.
Quick Facts
IP developer
VSIP Hai Duong
Total IP land area
150 ha
BW's land area
42.6 ha
Location
Plot 5, Cam Dien - Luong dien Industrial Park, Cam Dien Commune, Cam Giang District, Hai Duong Province, Vietnam
Property type
Ready-built factory for rent
Construction timeline
May - October 2019 (Phase 1)
Land expiry
05 August, 2058
Embark on a succesful journey with BW
- Our ready-built factory for rent in Vietnam with strategic location with convenient access to both Hanoi and Hai Phong, direct access to Hanoi - Hai Phong Highway
- Competitive employment costs (region 3 minimum wage)
- Hassle-free bussiness setup thanks to BW's strong connections with the local authorities
- Presence of mature neighboring industries:
Tax incentives
(for common industries)
Preferential industry tax rate = 10%
(for the first 15 years)*
*Applicable to preferential industries:
• High-tech industries
• Total investment capital: 6,000 billion VND (~265 million USD)
+ Capital contribution within 3 years
+ At least 3,000 employees

Utilities
Stable Power Supply: 96 - 333 KVA/factory
New price from 20 March, 2019. Exchange rate USD/VND = 23,210 (selling rate of Vietcombank on 25 April, 2019)
• Water usage rate: standard (14,500 VND/m3)
• Wastewater treatment: 5,849 VND/m3 (based on 80% water consumption)
• Telecommunication by VNPT
• Internet cable and phone lines: connection points are installed up to each individual factory unit
* All prices are VAT exclusive
High tension 22 KV (Capacity ≥ 250 KVA) |
Low tension 380 V (Capacity < 250 KVA) |
|
Normal hours |
1,555 VND/kWh | 1,685 VND/kWh |
Peak hours |
2,871 VND/kWh | 3,076 VND/kWh |
Off-peak hours |
1,007 VND/kWh | 1,100 VND/kWh |
Proximity
To Hanoi Center | To Hai Phong Port | To Noi Bai Airport | |
52 Km | 61 Km | 62 Km | |
75 minutes | 90 minutes | 90 minutes |
Transportation cost *Updated price from March 2019
To | 40 ft FCL (VND/trip) | 2 ton Truck (VND/trip) |
Noi Bai Airport | 750,000 | |
Hai Phong Seaport | 4,250,000 |
Minimum wage 3,250,000 VND/ month (region 3) *According to Decree No. 157/2018/ND-CP on 01 January, 2019
Facilities
Car & motorcycle sidewalk parking
24hr security with CCTV, fence and security booth
Fire fighting system (emergency switch, fire alarm, fire hose box, fire extinguisher)
Download Hai Duong Masterplan HERE
Project Features
Located
In Hai Duong - Favourable location: one of 8 provinces in the Northern Key Economic Zone
Convenient transportation and comprehensive infrastructure
There are many important national roads cutting through the province such as National Highway No 5A, No.183, 18... and the railway system
Tax Incentive
2 years exemption + 4 years 50% reduction
Existing large tenants in province
Bother, Canon, Daikin, Ford…
Pictures

Address
Plot 5, Cam Dien - Luong dien Industrial Park, Cam Dien Commune, Cam Giang District, Hai Duong Province, Vietnam