
INDUSTRIAL FACTORY FOR RENT IN VSIP BAC NINH IP BAC NINH
BW industrial factory for rent locates inside an industrial Zone in VSIP Bac Ninh IP Bac Ninh. It is located in prime location next to Highway 1 and 3, connecting to all Northern Provinces, easy access to Noi Bai Airport
Quick Facts
IP developer
VSIP Bac Ninh
Total IP land area
500 ha
BW's land area
3.8 ha
Location
No. 05, Road 21A, VSIP Bac Ninh Integrated Township and Industrial Park, Dai Dong Commune, Tien Du District, Bac Ninh Province, Vietnam
Property type
Ready-built factory for rent
Construction timeline
February - July 2019 (Phase 1)
Land expiry
30 November, 2057
Embark on a succesful journey with BW
- Our ready-built factory for rent in Vietnam with strategic location next to Highway 1 and 3, connecting to all Northern Provinces, with close proximity to Noi Bai Airport for easy access to main infrastructure and amenities of Hanoi
- Hassle-free bussiness setup thanks to BW's strong connections with the local authorities
- Presence of mature neighboring industries:
Tax incentives
(for common industries)
Preferential industry tax rate = 10%
(for the first 15 years)*
*Applicable to preferential industries:
• High-tech industries
• Total investment capital: 6,000 billion VND (~265 million USD)
+ Capital contribution within 3 years
+ At least 3,000 employees

Utilities
Stable Power Supply: 250-400 KVA/factory
New price from 20 March, 2019. Exchange rate USD/VND = 23,210 (selling rate of Vietcombank on 25 April, 2019)
• Water usage rate: standard (9,470 VND/m3)
• Wastewater treatment: 4,910 VND/m3 (based on 80% water consumption)
• Telecommunication by VNPT
• Internet cable and phone lines: connection points are installed up to each individual factory unit
* All prices are VAT exclusive
High tension 22 KV (Capacity ≥ 250 KVA) |
Low tension 380 V (Capacity < 250 KVA) |
|
Normal hours |
1,555 VND/kWh | 1,685 VND/kWh |
Peak hours |
2,871 VND/kWh | 3,076 VND/kWh |
Off-peak hours |
1,007 VND/kWh | 1,100 VND/kWh |
Proximity
To Hanoi CBD | To Noi Bai Airport | To China Border | |
22 Km | 43 Km | 152 Km | |
37 minutes | 43 minutes | 170 minutes |
Transportation cost *Updated price from March 2019
To | 40 ft FCL (VND/trip) | 2 ton Truck (VND/trip) |
Noi Bai Airport | 750,000 | |
Hai Phong Seaport | 4,250,000 | 1,650,000 |
Minimum wage 3,710,000 VND/ month (region 2) *According to Decree No. 157/2018/ND-CP on 01 January, 2019
Facilities
Car & motorcycle sidewalk parking
24hr security with CCTV, fence and security booth
Fire fighting system (emergency switch, fire alarm, fire hose box, fire extinguisher)
Download Bac Ninh Masterplan HERE
Project Features
Located
Located in Bac Ninh - Lies on the economic corridor of Nam Ninh – Lang Son – Hanoi – Hai Phong – Ha Long and connects the administrative capital Hanoi with the Northern midland and mountainous provinces
Strategic Location
Near Hanoi and Noi Bai International Airport: 20km from Hanoi, 40km from Noi Bai airport
Tax Incentive
2 years exemption + 4 years 50% reduction
Proximity to largest Queen bee
Samsung, Foxconn, Unilever, ALS, Pepsico…
Pictures




.jpg)

Address
No. 05, Road 21A, VSIP Bac Ninh Integrated Township and Industrial Park, Dai Dong Commune, Tien Du District, Bac Ninh Province, Vietnam